Skip to content

2 storeys

Mahogany

A fourth bedroom, on 78 m² of land

Price

Rp 2.099.256.420

The published price covers the house and the land it stands on. Upfront costs are worked out in the calculator below.

Land
78 m²
Floor area
100 m²
Bedrooms
4
Bathrooms
3
Carports
2
Storeys
2
Water
PAM mains water

The plan

How the house is arranged

Mahogany sits between the other two: 78 m² of land, 100 m² of building over two storeys, four bedrooms and three bathrooms. The fourth bedroom is what separates it from Oak; everything else along the row is shared. Carport for two cars under a flat cantilevered canopy, and the same elevation the developer's renders show on every house here: a charcoal base wall, warm wood-tone vertical louvres, tan-beige panel infill and black-framed full-height glazing. SHM title, PAM mains water, one gate system with CCTV and a security post, ready to occupy. The plan drawn on this page is an illustration worked out from the published land and building areas; the final room dimensions follow the working drawings.

Carport6.0 × 4.4 mFront terrace6.0 × 1.0 mLiving room3.4 × 3.0 mDining room2.6 × 3.0 mBedroom 43.0 × 2.4 mGuestbathroom1.5 × 2.4 mStair hall1.5 × 2.4 mKitchen3.4 × 2.2 mService area2.6 × 2.2 m

The arrangement shown here is indicative, worked out from the published land and floor areas. The final room layout and dimensions come from the developer’s working drawings.

Illustration of a furnished interior

Living room

3.4 × 3.0 m

Room sizes are taken to the inside face of the wall, not to its centreline. Check them against the developer’s working drawing before you order anything that has to fit.

Build specification

What the house is made of

Ask for this same list as a written annex to the sale agreement before you sign.

Certificate
SHM (Hak Milik)
Building condition
New build, ready to occupy
Storeys
Two floors
Water
PAM mains supply, no borehole

Payment

Three ways to pay

Three ways to pay, each with its own order of steps. The amounts are not published, so the marketing team confirms them for the unit you pick.

Cabana has not published the amounts for this route. The steps below are the order the process runs in; the booking fee, the down payment and the schedule come from the marketing team.

  1. 1Reserve the unitA booking fee holds the kavling. Ask the marketing team what it is and whether it comes off the down payment.
  2. 2Down payment to the developerPaid before the mortgage file goes to the bank. The share and the deadline are set by the developer and by the bank you apply to.
  3. 3Mortgage released by the bankThe bank pays the balance to the developer once the credit agreement is signed. The tenor and the rate are the bank's, and the calculator on this site lets you test them.

Mortgage

What Mahogany costs per month

The price is already filled in. Change the down payment and the term to match your position.

Enquire

Ask about Mahogany directly

Tell us which type you want and we will send the price and the current payment terms in writing.

Starting from

Rp 1,9 B

Schedule a visit